Block · Production

Production planning software: your plant’s schedule, hour by hour

Your plant, planned down to the detail.

Building the production plan in a spreadsheet works until the plant grows. You have to match pending orders against lines, formats, changeover and cleaning times, shifts and operators, and every time a rush order comes in or a line stops, the plan gets redone by hand. The result is a plan nobody dares to touch, more format changeovers than needed, and orders that ship late without anyone seeing it coming.

The nBlock Production block models your plant and your pending orders, and builds the plan hour by hour, line by line, within your constraints. An assistant lets you ask for changes in plain language and shows you the impact on order fulfillment and efficiency before anything changes: it proposes, and a person applies. It works on top of the ERP you already have, which stays the source of truth for orders and stock.

ProductionBlock · Production

Challenge

Planning the plant by hand leaves bottlenecks, idle lines and orders you cannot fulfill.

Solution

An optimizer that builds the best possible plan while respecting lines, reactors, shifts, SKUs and every real constraint you have.

Impact

Higher order fulfillment and fewer bottlenecks.

  • The best possible plan for your plant
  • A model of your plant: lines, shifts and SKUs
  • Higher order fulfillment, fewer bottlenecks
Production planning

How it works on your ERP

  1. Step 1

    Models your plant and your orders

    You describe how your plant works: lines, formats, changeover and cleaning times, shifts, operators and tanks. Pending orders are read from the ERP, with nothing to enter again.

  2. Step 2

    Builds the plan hour by hour

    It sequences the orders on each line within preparation times, shifts and capacity, and flags the ones that finish late. The board shows the full plan with its fulfillment and efficiency.

  3. Step 3

    Simulates every change before you apply it

    You ask the assistant, in plain language, to cut format changeovers or to pull late orders forward. It simulates the change and shows what happens to fulfillment and efficiency. You decide whether to apply it.

  4. Step 4

    Replans the line that stopped

    You log the stop and the block proposes a new plan for that line only, without touching the rest of the plant. Every version of the plan is kept and can be restored.

Where it is used

Prioritizing a rush order

An order nobody expected comes in. You ask the assistant to prioritize it, see how many orders slip and how much efficiency drops, and only then decide whether to apply the change.

Cutting format changeovers

Resequence the runs to reduce changeover and cleaning time, looking at the effect on fulfillment before touching the week’s plan.

Keeping production going when a line stops

A line goes down for maintenance or a fault. You log the stop and replan that line only, without redoing the plan for the whole plant.

Frequently asked questions

Does it replace my ERP or my MES?

No. It works as a layer on top of the ERP you already use: it reads orders and stock and builds the plant’s plan. The ERP stays the source of truth. It is not a shop-floor execution system either: it plans what is produced, on which line and when.

What data do I need to get started?

Pending orders, which come from your ERP, and a description of your plant: lines, formats, changeover and cleaning times, shifts, operators and tanks. If you build the plan in a spreadsheet today, that spreadsheet is usually a good starting point for modeling the plant.

What happens when a line stops or a rush order comes in?

If a line stops, you log the stop and ask for a new plan for that line; the rest of the plant is left alone. If a rush order has to be prioritized, you ask the assistant, which simulates the change and shows the effect on fulfillment and efficiency before anything is applied. Every plan is kept as a version you can restore.

Does the AI change the plan on its own?

No. The assistant proposes and simulates, but it applies nothing: before every change you see how fulfillment and efficiency end up, and a person applies it. Since every plan is saved as a version, you can always go back.

Next step

Shall we look at it on your own data?

In half an hour we show you how the production block runs on your ERP and what changes in your operation.